Pavo-1 well

Pavo-1 well makes material oil discovery

Santos and Carnarvon Energy have confirmed the Pavo-1 exploration well has a significant oil discovery 46 kilometres east of the Dorado field in the Bedout Sub-Basin, offshore Western Australia. The well
Read More

DOF Subsea secures Enfield contract

Woodside Energy has awarded DOF Subsea Australia an offshore support services contract for the Enfield XT Retrieval. The campaign execution will involve the recovery of 18 Subsea XTrees, 18 Flowbases and
Read More

Morrison government backs Golden Beach project

In partnership with GB energy, the Australian government has announced that it will be issuing a $32 million commercial loan to fund the Golden Beach project. The project, located offshore Gippsland,
Read More
NOPSEMA expands to offshore infrastructure

NOPSEMA approves Mutineer Exeter cessation

The National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) has approved the Mutineer Exeter cessation of production (CoP) environmental plan from Santos. Santos, which is Australia’s
Read More
Santos sells Barossa interests

Green light for Barossa drilling, well campaign

The national petroleum regulator has approved Santos’ Barossa Development for its plans to commence a drilling and well campaign in the second quarter of 2022. The company advised that, as part of the
Read More
Pavo-1 well

Pavo-1 well reaches new depths: Carnarvon

Carnarvon Energy has drilled the Pavo-1 well, located in the WA-438-P exploration permit in Western Australia, to 3282 metres measure depth (MD). The company reached this depth in the 8.5-inch hole before
Read More
Woodside Energy

NOPSEMA approves GWA EP revisions

Woodside Energy has received approval from the National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) for a revision it submitted to the Operational Environment Plan for Goodwyn Alpha (GWA) in Commonwealth waters. 
Read More
bayu undan

Bayu-Undan CCS project enters FEED phase

Santos, as operator of the Bayu-Undan offshore gas production facility, has announced entry into the front-end engineering and design (FEED) phase for the proposed Bayu-Undan carbon capture and storage (CCS) project. 
Read More