The company released a scoping study estimating that it could pipe its phosphate slurry between 220 and 266 km from the mine to the
Read More
United Pipeline Systems awarded WA slurry pipeline contract
The company will install its Tite Liner solution on a new 32 inch diameter steel magnetite concentrate pipeline.
United anticipates work on the project
Read More
Read More
Cadia Holdings proposes slurry pipeline looping
The new pipeline will be designed to handle the full duty from the Cadia East Project, approximately 17 MMt/a of gold and copper, and
Read More
Read More
Exxon’s Ethane Pipeline repaired
The 78 km, 10 inch diameter Ethane Pipeline was ruptured on 13 December 2008 by the anchor of the vessel, APL Sydney, as it
Read More
Read More
Oil Search powers up PNG
Beginning operations today, WSP and Oil Search helped deliver the first grid connected, gas fired power station which will provide reliable and affordable power to the community. Working with Oil Search,
Read More
Read More
Allens advises on solar-gas project
NAIF’s loan will help fund the construction of electrical infrastructure at Fortescue Metals Group Chichester Hub iron ore mines, including a 60-megawatt solar panel plant and a 60km transmission
Read More
Read More