Santos plans for Darwin Export Gas Pipeline

With the Bayu-Undan gas field nearing its end of life, Santos has proposed a revision to its Darwin Gas Export Pipeline environment plan (EP). The revision is put forward with the hope of maintaining the
Read More
AusNet shares

NOPSEMA assesses BHP pipeline closure

BHP Petroleum’s plan for closure of the Griffin Gas Export Pipeline (GEP) is under assessment by The National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA). The GEP is located
Read More
Bowen Basin Pipeline

Qld basin pipeline to reduce emissions

A gas pipeline in Queensland’s Bowen Basin could future-proof gas supply, reduce emissions and help create jobs, a new study has found. Resources Minister Scott Stewart released the Bowen Basin Pipeline
Read More

Barossa Gas export pipeline plan reassessed

The national regulator is assessing Santos and SK E&S Australia’s plans to develop a new 285 km pipeline from the Barossa floating production storage and offloading (FPSO) facility to the existing
Read More